An integrated approach to the design and quality control of window structures
We carry out a detailed analysis of the Customer's design documentation and offer optimal engineering solutions based on accurate calculations of static and thermal engineering. All calculations are provided to the project team both electronically and in hard copy, ensuring transparency and validity of our recommendations.
SEC Specification: standardization and control
For each project, we develop a detailed specification of translucent structures, in which we specify:
- Estimated product loads;
- Number of window structures;
- The applied profile system;
- Reinforcement and filling type.
This approach makes it possible to eliminate discrepancies among processors and minimize the risks of using different materials, especially when choosing reinforcement.
Гарантированное качество производства
Since 2024, companies operating on our specialized systems have been conducting an annual mandatory production inspection. Our technical specialists evaluate 133 criteria for the assembly quality of window structures, identifying possible errors at different stages of production. Based on the results of the inspection, an official report is generated, which is sent to the first head of the company.
Control of new production partners
If the Customer starts cooperation with a new processor who has not previously worked with our specialized systems, we carry out an on-site inspection of production. Evaluated:- Technological process;
- Production equipment;
- The condition of warehouses of materials and finished products;
- Availability of necessary documentation for production management;
The results are recorded in an official letter and sent to the first head of the Customer's company. If the production meets our standards, cooperation begins with the mandatory assembly of the first window under the supervision of our technical specialist. This guarantees staff training in all the specifics of working with SMART profile systems.
Two-step inspection before installation
Production control – checking the window unit according to 15 parameters before shipment. Only structures that meet quality standards are sent to the facility.
On–site inspection - checking the installed window unit according to 9 key parameters.
The first mounted structure becomes a reference model for the entire project, which guarantees stable quality throughout the entire implementation.
Our approach is to guarantee the reliability, durability and exact compliance of window structures with design requirements.